Cashel Street/Day Drive Road Rehabilitation

South Australia

About This Project

Funded by the City of Mitcham and Roads to Recovery, the rehabilitation project involved new kerbs and road surfacing, ripping out the old damaged kerbs and profiling back to replace the surface.
Greenhill Engineers undertook detailed design and construction superintendence.
The project was completed on time, maximised access for residents and resolved a number of previous problems with pavement failure due to the roots of large trees. The design increased pavement depths to prolong the life of the upgraded kerbs.

Please click on the thumbnails below to see full-size images.

Category
Transport